Glossop Vision Regeneration Programme 2007-2009

Background

The implementation of these schemes marks stage three of the Glossop Vision Masterplan process. The creation of the Glossop Vision Master Plan in 2004 delivered a vision for the town to be implemented over the next 15 years, identifying key areas of the town where improvements would make a real difference. The plan proposed improvements along the length of the A57 and Glossop Brook, aiming to improve the pedestrian experience through the town, improving walking and cycling routes.

Stage 2 of the process assessed and prioritised the projects identified in the Masterplan, using a number of criteria, including public interest and desirability. High levels of support were shown for projects relating to the High Street, the Station forecourt and park areas, and these areas were selected as the focus for investment using Liveability funding.

Improvement works have also been carried out at Manor park with the installation of new play equipment and skatepark area, the resurfacing of the car park and river engineering works.

      High Street West
Glossop High Street West in 2007 Glossop High Street West now
2007 2008

Improvements at Smithy Fold (pictured below) have helped to create a historic link through the town centre. The re-laying of existing setts and the inclusion of two natural stone cart tracks ensure Smithy Fold is accessible to all, and add to the historic atmosphere of the town.

      Smithy Fold
Glossop Smithy Fold in May 2007 Glossop Smithy Fold since February 2008
May 2007 Since February 2008

Glossop Vision Master Plan background Information